• Infraestructuras

We create a system to harness energy in Egypt

State-of-the-art technologies will be introduced to recover waste heat from gas turbines to generate electricity. This energy will power the compression station and reduce CO2 emissions. 

Sacyr Proyecta, a subsidiary of Sacyr Engineering and Infrastructure, is currently tasked with the engineering, the procurement of materials and equipment, and the provision of technical assistance during the construction project to expand the Dahshour gas compression station for the Egyptian Natural Gas Company (GASCO), the state operator of Egypt’s gas network. 

Sacyr Proyecta will supply three new compressors for gas distribution to Cairo, which will join the four compressors already in existence. 

In addition, state-of-the-art technologies will be introduced to recover waste heat from gas turbines to generate electricity. This energy will power the compression station and reduce CO2 emissions. 

 


 

The project is part of the “Green Economy Transition” (GET), a program launched in 2015 by the European Bank for Reconstruction and Development (EBRD), whose goal is to help the countries in which it operates—including Egypt—to adopt eco-friendly development models in order to improve the sustainability of gas transmission, for example. 

“We are undertaking a project through which we can generate the power needed to make the plant self-sufficient by using the heat of the exhaust from the gas turbines”, explains Saturnino Teijeiro, Dahshour project manager at Sacyr Proyecta.

The process is as follows: the exhaust generated in the combustion of each compressor’s turbine is currently emitted directly into the atmosphere. With the implementation of this project, Sacyr will install a waste heat recovery unit at the outlet of each turbine, so hot combustion gases can be used to heat thermal oil. The heated oil is channeled to the organic Rankine cycle (ORC) plant, contracted from an Italian company (Turboden). This plan consists of two turbines connected to two electrical generators. 

 


 

At the ORC plant, the heated oil is used to vaporize a fluid that feeds two turbines, enabling us to generate the energy needed to power the Dahshour compression station, making it independent of the country’s power grid. 

The expansion of the plant, which is located in Cairo, will require an investment of nearly USD 110 million (roughly EUR 80 million) and will have an 18-month timeline for completion. 

Sacyr Proyecta’s role in this project will be completed in May 2024. 

We use our own and third party cookies for analytical purposes. Click on HERE for more information. You can accept all cookies by clicking the "Accept" button or set them up or refuse their use by clicking.

Cookie declaration

These cookies are necessary for the website to function and cannot be disabled in our systems. These cookies do not store any personally identifiable information.

Name Provider Purpose Expiration Type
LFR_Sesión_STATE_* Liferay Manage your session as a registered user Session HTTP
GUEST_LANGUAGE_ID Liferay Determines the language with which it accesses, to show the same in the next session 1 year HTTP
ANONYMOUS_USER_ID Liferay Manage your session as an unregistered user 1 year HTTP
COOKIE_SUPPORT Liferay Identifies that the use of cookies is necessary for the operation of the portal 1 year HTTP
JSesiónID Liferay Manages login and indicates you are using the site Session HTTP
SACYRGDPR Sacyr Used to manage the cookie policy Session HTTP

These cookies allow us to count visits and sources of circulation in order to measure and improve the performance of our site. They help us know which pages are the most or least popular, and see how many people visit the site. All information collected by these cookies is aggregated and therefore anonymous.

Name Provider Purpose Expiration Type
_gat Google It is used to throttle the request rate - limiting the collection of data on high traffic sites Session HTTP
_gid Google It is used to store and update a unique value for each page visited Session HTTP
_ga Google This is used for statistical and analytical purposes for increasing performance of our Services Session HTTP