Sacyr Proyecta will provide engineering services for Elengy for the renovation of the LNG terminal in Montoir-de-Bretagne, France

  • The contract includes engineering/design, procurement and construction management (EPCM) for the renovation of the Elengy LNG terminal at Montoir-de-Bretagne.

Sacyr Proyecta has been awarded the "Ulysse Project", aimed at the renovation of the ELENGY LNG terminal in Montoir-de-Bretagne, France. This project is a significant step in the modernization of the region's energy infrastructure.     

The contract includes engineering/design, procurement and construction management (EPCM) for this LNG facility. 

The main objectives of the Ulysse Project are to improve the plant's industrial safety, reduce its environmental impact and to upgrade the facilities to ensure its efficient and safe operation until at least 2035.

The main actions of the Ulysse Project include:

  • Installation and commissioning of two open rack vaporizers (ORV): The new Liquefied Natural Gas ORVs replace the existing submerged combustion vaporizers (SCV), maintaining the regasification capacity while reducing carbon emissions.
  • Replacement of natural gas pipelines: Part of the pipeline will be replaced, and risk control measures will be implemented to ensure the safety and efficiency of the gas transportation.
  • Infrastructure improvements: Improvements will be made to key structures to optimize terminal operations and safety.

This project not only reinforces Sacyr Proyecta's commitment to innovation and sustainability, but also positions ELENGY as a benchmark in the LNG industry, adapting the terminal to the environmental and safety requirements of the future.

About Sacyr Proyecta

Sacyr Proyecta employs more than 350 professionals and specializes in energy projects, focusing on the business areas of oil and gas, energy, chemicals and petrochemicals, LNG and renewable hydrogen.

Sacyr Proyecta  is currently developing, among other projects, the new HEH LNG terminal in Stade (Germany), several projects for Gate at the Rotterdam LNG Terminal (The Netherlands), a gas compression station in Egypt for GASCO, a polyethylene plant for Repsol in Puertollano (Spain), two (advanced biofuel plants for Repsol in Spain and the current award received from Elengy for the renovation of the LNG Terminal in Montoir-De-Bretagne (France).

Sacyr makes sustainability the cornerstone of its strategy, as detailed on the Sacyr Sustainable Route 24-27, the roadmap to company operations with the aim of becoming one of the best companies in the sector in terms of sustainability and maximizing positive impact on all stakeholders.
Commitments include reducing absolute greenhouse gas (GHG) emissions and achieve carbon neutrality by 2050.

This website uses its own and third-party cookies to improve the user experience and analyze their behavior in order to improve the service offered.
You can consult additional information about the cookies installed on our Cookies policy.

Cookie Settings

Cookie declaration

TECHNIQUES

These cookies are exempt from compliance with article 22.2 of the LSSI in accordance with the recommendations indicated by the European authority on privacy and cookies. In accordance with the above and although configuration, acceptance or denial is not possible, the editor of this website offers information about them in an exercise of transparency with the user.

  • Name: LFR_Session_STATE_*, Provider: Liferay, Purpose: Manages the session as a registered user , Expiration: Session, Type: HTTP

  • Name: GUEST_LANGUAGE_ID, Provider: Liferay, Purpose: Determines the language with which you access , to show the same in the next session, Expiration: 1 year, Type: HTTP

  • Name: ANONYMOUS_USER_ID, Provider: Liferay, Purpose: Manages the session as an unregistered user , Expiration: 1 year, Type: HTTP

  • Name: COOKIE_SUPPORT, Provider: Liferay, Purpose: Identifies that the use of cookies for the operation of the portal, Expiration: 1 year, Type: HTTP

  • Name: JSessionID, Provider: Liferay, Purpose: Manages login and indicates who is using the site, Expiry: Session, Type: HTTP

  • Name: SACYRGDPR, Supplier: Sacyr, Purpose: Used to manage the cookie policy , Expiration: Session, Type: HTTP