FTSE4Good

 


 

The FTSE4Good index series is designed to measure the performance of companies that demonstrate specific environmental, social and governance (ESG) practices. Transparent management and clearly defined ESG criteria have led Sacyr to remain in this index for another year. The rating obtained by Sacyr after the 2025 assessment was 4.4 out of 5 points.

This places Sacyr in the 100th percentile, with our score in the three areas of evaluation Environment 4/5, Social 4.3/5 and Governance 5/5 being much higher than the averages for the Construction and Engineering sector and the Heavy Construction subsector.

Among the different factors evaluated, Sacyr has achieved the highest score in Corporate Governance and labor standards.

 

  • P3 Projects

We completed the structure of the new Velindre Cancer Centre!

The construction of this healthcare facility Cardiff (Wales, UK), has reached a significant milestone: we have completed its main structure. The construction team and the local authorities celebrated the symbolic topping out event.

The construction of the new Velindre Hospital, located in Wales (UK), has reached a very significant milestone: we have completed the structure of the building.

To celebrate this milestone, we organized a topping out event attended by representatives of Sacyr and the other stakeholders involved: Velindre University NHS Trust, the Acorn consortium, the Welsh Government and the Velindre Cancer Charity.

The attendees performed the traditional "sprig ceremony", which consists of fixing a pine branch to the highest point of the building.

 

60,000

sqm 

of constructed surface

7.68

hectares

of land

1,7

million people

beneficiaries

The new 60,000 sqm cancer centre is designed to meet the growing need for cancer care in Wales and will serve 1.7 million people.

The project is being executed by the Acorn consortium, comprising Sacyr, Kajima Partnerships, abrdn, the Development Bank of Wales and a range of long-term funders.

The nVCC (new Velindre Cancer Center) will strengthen the capacity of the Velindre Cancer Service to provide state-of-the-art radiotherapy and systemic anticancer therapy. It will have one of the largest radiotherapy units in the United Kingdom, equipped with 10 state-of-the-art linear accelerators.

This project will improve the quality of care and clinical outcomes for patients in Wales through world-class cancer treatment, enhanced diagnostic capability and greater access to innovation, training and research.

Sustainability at the core

The centre is also being built with sustainability at its core. It will be fully electric from day one, designed to meet the highest environmental standards, and constructed using low-carbon and locally sourced materials wherever possible.

As the project moves into the next stage of construction, more of the internal fit-out will start alongside preparing the building for commissioning ahead of its opening in Spring 2027.
 

Featured projects
  • Water

World Water Day: 30 years committed to the future of water

At Sacyr Agua, we have spent three decades dedicated to protecting, transforming and returning water to the planet in a responsible manner. Our commitment to the sustainable management of water resources is an essential part of our raison d'être.

We work to optimize every drop: we produce fresh water through desalination, treat and regenerate the water used for new uses and ensure that it is returned to nature in optimal conditions.

Over the past 30 years, we have built more than 100 treatment plants. Today we are the largest operators of desalinated water in Spain, supplying 16 million people in five countries and contributing to the irrigation of 25,000 hectares of agricultural land thanks to the water transformed in our facilities.

At Sacyr Water, we stand out for the versatility of our contracts. We manage the integral water cycle in several cities, operate and maintain facilities, build treatment plants and manage long-term investment contracts for water infrastructure.

Efficient management

Our experience and technical excellence are reflected in the efficient management of multiple sources of supply and in the quality of the design and construction of facilities that optimize natural resources and minimize environmental impact.

We are Water Positive: we generate a net positive impact, creating water resources for future generations. Innovation is our driving force, enabling us to continuously improve our processes, energize the economy, ensure water availability and drive key sectors such as agriculture and industry.

Every day, Sacyr Water's 2,000 professionals work to guarantee this essential resource for life.

More information at: www.sacyragua.com

Featured projects
  • Results

FY 2025 Results presentation

The company announces call notice of the group’s FY-2025 results presentation

The results will be released on Thursday, February 26 th, 2026, after market close in CNMV and on our website.

The results presentation will be held on Friday, February 27 th, 2026, at 12:00h (CET) by audio-webcast in real time, accessible through this link.

Access to the presentation of results replay will also be available directly at the link above.

Featured projects
  • Innovation

We publish our 2025 Information Report: creativity, collaboration and future

We are launching a new edition of this document in which we highlight the investment of €8.2 million in the development of new solutions and the implementation of 42 innovation projects.

We present the 2025 Innovation Report, a journey through everything we have been able to achieve together. Every project, every idea and every collaboration demonstrates that innovation is the driving force behind our drive to transform the world and meet our challenges.

During 2025, we allocated €8.2 million to the development of new solutions and launched 42 innovation projects. In addition, 40% of the initiatives had sustainability at their core, reaffirming our will to care for the planet as we move forward.

Innovation was also born of collaboration. Thanks to our commitment to Open Innovation, we developed 13 projects in alliance with startups, demonstrating that shared talent amplifies our capabilities and allows us to look further ahead.

Internal participation is also key. More than 2,700 professionals joined initiatives such as the 3 iFridays and 8 iPodcasts, spaces that inspire, connect and bring together new ways of thinking. And we celebrated the 10th edition of the Natural Innovators Awards, with 117 nominations from 11 countries, where we recognized the talent, creativity and innovative drive of 18 people.

With each step taken, we reinforce our commitment to a more efficient and sustainable infrastructure model with a positive impact on society and the environment. Innovation will continue to guide our roadmap and open up new opportunities to continue transforming the world we share.

Discover the 2025 Innovation Report here.

Featured projects
  • P3 Projects

Pedemontana-Veneta, our great concession

In the third chapter of the series on emblematic projects in Sacyr's 40-year history, we talk about the largest concession in the company's portfolio: the Pedemontana-Veneta highway in northern Italy.

We review this infrastructure with José Alberto Ruiz Pelayo and Beatriz Jiménez Uribe, who give us the keys to its development.

We traveled to northern Italy to visit the third emblematic project in our series on Sacyr's 40-year history.

The Pedemontana-Veneta highway is the largest concession in our portfolio. Its 162-kilometer route connects the cities of Vicenza and Treviso, located in one of Italy's most important industrial hubs. The highway became fully operational in 2023 and is one of the most modern infrastructures in the country.

The Pedemontana-Veneta was developed by SIS consortium, the vehicle through which we invested in Italy together with our local partner Fininc.

162

km

of the route between Vicenza and Treviso

2023-2063

start and end of operation date

1,571

M€

of bond financing

A logistical challenge

To explain how this project was developed, we spoke with José Alberto Ruiz Pelayo, then Italy Operations Manager, and Beatriz Uribe Jiménez, Facilities Production Manager.

"The most disruptive construction techniques focused on mitigating the environmental and visual impact," explains José Alberto.

One of the most relevant challenges of the project was overcoming the Covid-19 pandemic. "There was a shortage of construction materials that we had to overcome with a logistical system that allowed us to meet the project deadlines," emphasizes Beatriz Uribe.

Featured projects
162

km

of the route between Vicenza and Treviso

2023-2063

start and end of operation date

1,571

M€

of bond financing

A logistical challenge

To explain how this project was developed, we spoke with José Alberto Ruiz Pelayo, then Italy Operations Manager, and Beatriz Uribe Jiménez, Facilities Production Manager.

"The most disruptive construction techniques focused on mitigating the environmental and visual impact," explains José Alberto.

One of the most relevant challenges of the project was overcoming the Covid-19 pandemic. "There was a shortage of construction materials that we had to overcome with a logistical system that allowed us to meet the project deadlines," emphasizes Beatriz Uribe.

0 Folders
4 Documents
0 Folders
1 Document
28.300 m2

construcción nuevo museo

Superficie

645

M€

Inversión 

Revitalización de Ontario Place

El nuevo Museo de Ciencias de Ontario es una pieza clave en la transformación de Ontario Place, un espacio cultural emblemático junto al lago Ontario que será renovado para convertirse en un moderno hub científico y recreativo. El proyecto contempla: La construcción del nuevo museo, con unos 28.300 m², la rehabilitación de los Pods y la Cinesphere, que suman 6.600 m², nuevas pasarelas peatonales que conectarán los distintos elementos del complejo, la preservación e integración de activos patrimoniales históricos.

La Cinesphere mantendrá su función como sala de proyección, mientras que los Pods serán modernizados para integrarse en el nuevo recorrido museístico. Sacyr y Amico ya colaboraron previamente en el proyecto sanitario Grandview Kids en Ajax. El contrato incluye también el mantenimiento de la instalación durante 30 años, que será ejecutado por Johnson Controls

El nuevo museo será una instalación de categoría mundial orientada a despertar la curiosidad científica de visitantes de todas las edades. Su programación educativa, con fuerte base STEM, lo convertirá en uno de los principales centros de divulgación científica de Canadá.
 

Participación de Sacyr

Una joint venture formada por Sacyr y Amico ejecutará la construcción del proyecto. Está previsto que las obras comiencen en primavera de 2026, generando empleo local y una actividad constructiva significativa.

Este proyecto representa la primera concesión de Sacyr en Canadá, un hito alineado con el Plan Estratégico 2024–2027, que establece como prioridad el crecimiento de la cartera concesional en países de habla inglesa

El contrato tiene un valor de 1.040 millones de dólares canadienses (aprox. 645 millones de euros). 
 

This website uses its own and third-party cookies to improve the user experience and analyze their behavior in order to improve the service offered.
You can consult additional information about the cookies installed on our Cookies policy.

Cookie Settings

Cookie declaration

TECHNIQUES

These cookies are exempt from compliance with article 22.2 of the LSSI in accordance with the recommendations indicated by the European authority on privacy and cookies. In accordance with the above and although configuration, acceptance or denial is not possible, the editor of this website offers information about them in an exercise of transparency with the user.

  • Name: LFR_Session_STATE_*, Provider: Liferay, Purpose: Manages the session as a registered user , Expiration: Session, Type: HTTP

  • Name: GUEST_LANGUAGE_ID, Provider: Liferay, Purpose: Determines the language with which you access , to show the same in the next session, Expiration: 1 year, Type: HTTP

  • Name: ANONYMOUS_USER_ID, Provider: Liferay, Purpose: Manages the session as an unregistered user , Expiration: 1 year, Type: HTTP

  • Name: COOKIE_SUPPORT, Provider: Liferay, Purpose: Identifies that the use of cookies for the operation of the portal, Expiration: 1 year, Type: HTTP

  • Name: JSessionID, Provider: Liferay, Purpose: Manages login and indicates who is using the site, Expiry: Session, Type: HTTP

  • Name: SACYRGDPR, Supplier: Sacyr, Purpose: Used to manage the cookie policy , Expiration: Session, Type: HTTP