CSR
Sacyr Foundation 2024 Annual Report is live
25/03/2025
Highlights
Innovation
28/03/2025
Infrastructures
We have built a photovoltaic plant for Repsol in Badajoz
Sacyr Industrial, in a temporary business association with Solarig (50%-50%), has overseen the construction of the photovoltaic plant that Repsol runs in Valdecaballeros (Badajoz).
10/09/2021
Infrastructures
More than 100,000 safe man-hours without lost time injury at the Tchammawind farm.
This major achievement, which has been recognized by Chile’s Mutual de Seguridad, demonstrates our commitment to occupational safety.
04/08/2020