This is one of largest infrastructure projects built to date delivered by the Department for Infrastructure construction in Northern Ireland and is now open to traffic.
Highlights
![](https://sacyr.com/documents/121856245/121929501/A6-IrlandadelNorte_1140x640.jpg/7b871d25-3d8c-b986-22b6-a6b898e3d3c1?t=1681375067049)
![](https://sacyr.com/documents/121856245/121929501/Placas_Intra.jpg/37ec308b-8f03-ad5e-8f3b-cc916cef78d2?t=1704801328488)
Sustainability
Una sede más sostenible con energía solar
Instalamos tres marquesinas fotovoltaicas en el parking de nuestra sede central en Madrid, que abastecerán el 10% del consumo
04/09/2023
Infrastructures
We’ve completed the A Coruña exterior port
Our colleagues from Sacyr Engineering and Infrastructure have completed two Repsol projects on the el puerto Exterior de A Coruña that will allow the gas company to move their operations from the San Diego inner port to Punta Langosteira.
15/03/2023
Infrastructures
We put the ‘speed’ in the high-speed rail section in Elorrio
The high-speed rail works on the Elorrio (Biscay) section continue to conquer significant milestones: the excavation of the Zumelegui tunnel and the recent laying down of the board for the Goikoa viaduct.
23/02/2023