We are building the 20.85km railway platform for Adif Alta Velocidad on the Palencia Norte-Amusco section of the Palencia-Aguilar de Campoo (Palencia) high-speed line.
In the early stages of the project, the team in charge of the site detected the San Antolín Mine, an old mining operation near the town of Monzón de Campos, less than 500 meters away from the railway platform. 585,000 tons of earthwork spoils could be transferred to this quarry.
From there, our team's work began to coordinate the restoration with Adif AV, the Mines local authority, the Environment area of the Castilla y León government, and the landowner.