Through our Italian subsidiary, SIS, we have undertaken a project to modernize and repair a 31 km section of the old Salerno-Reggio Calabria road. This project, with a budget of 815 million euros, has turned this section of the highway into a world class toll road.
The section runs between the Calore Viaduct (km 108) and the Lauria Nord exit (km 139), a mountainous area with a complex orography, which involved building 36 new viaducts, 13 double tunnels with a tube length of 15.3 km, 8 double false tunnels, 2.2 km in total length, and 3 new slip lanes.