News

Infrastructures

We’ve completed the A Coruña exterior port

Our colleagues from Sacyr Engineering and Infrastructure have completed two Repsol projects on the el puerto Exterior de A Coruña that will allow the gas company to move their operations from the San Diego inner port to Punta Langosteira.

15/03/2023

Results

2022 Results: we raised the EBITDA by 63% and reached a record 26% profitability rate

Sacyr registered steep growth last year thanks to its sustainable concession-driven strategy. Last year, the company brought six new assets into operation and the backlog climbed to close to €55 billion.

24/02/2023

Infrastructures

We put the ‘speed’ in the high-speed rail section in Elorrio

The high-speed rail works on the Elorrio (Biscay) section continue to conquer significant milestones: the excavation of the Zumelegui tunnel and the recent laying down of the board for the Goikoa viaduct.

23/02/2023