The project is in the final construction phase and we have begun commissioning and implementation testing to ensure the mechanical, electrical, and control systems function properly and are correctly linked to the existing plant.
In a consortium with Westforce Construction, we have expanded the Neerabup Groundwater Treatment Plant (northern Perth, Australia) from its original 100,000 m3/day to 150,000 m3/day.
The €33-million contract is an EPC or turnkey project that includes detailed engineering, the supply of equipment and materials, civil construction and electromechanical assembly, as well as the testing and commissioning of works for the expansion of the water treatment plant.